Reunion · Kissimmee 34747 · License CGC1531832
Roll-in shower in Reunion
The Reunion grand bath started as a garden tub, wallpaper, and a shower you had to step up into. It was rebuilt as a roll-in, wheelchair-accessible wet room.

The existing house
A garden tub you cannot safely use, plus a separate shower with a curb, wastes the only primary bath. Grab bars screwed into tile after the fact do not fix the threshold. The floor has to be opened.
Reunion houses inside the resort often still have the original tub-and-shower split. Guests and owners both need a bath that does not depend on a high step, and the finish still has to look like the rest of the house — not a medical suite dropped into a vacation home.
How this job is built
We removed the threshold and rebuilt the shower as a roll-in you can enter without stepping up — stone, glass, and a layout that takes a wheelchair. This is the before-and-after we can show. It sits in Reunion, which is Kissimmee 34747, a short drive from the studio at 7593 Gathering Dr. #409. Smart-home safety, if you want it, is planned while that floor is open.
Osceola County permit, our drawings, our inspections. The same license as the rest of the practice: CGC1531832.
If this was your project
A Google review that names the city and the job is what shows up when a neighbor searches. In your own words: “Roll-in shower in Reunion.”
Leave a Google reviewPhotographs from this job

How we work
Design-build, from the visit to the walkthrough.
- 01
Discover
We start by understanding your property, goals, lifestyle, scope, and vision. The first meeting is a free on-site consultation.
- 02
Design
We develop the concept and design around your needs, property, and investment.
- 03
Plan
We coordinate the details, selections, permitting, scheduling, and construction planning.
- 04
Build
Our team manages construction through completion with attention to craftsmanship, communication, and quality.
- 05
Complete
Your project is finished with the same attention to detail that went into the planning and construction.
Same city, different scope
FAQ
Permits, time, and the first visit.
- Was the Reunion grand bathroom a real roll-in conversion?
- Yes. The before is a garden tub and a stepped-in shower. The after is a roll-in, wheelchair-accessible wet room. We do not describe a trend photo as that job.
- Do you do this inside the Reunion resort?
- Yes. Reunion is home base. Kissimmee 34747 is the same zip and the same county.
- Can a kitchen in the same Reunion house move faster than the bath?
- A kitchen or a simpler bath can finish in as little as two weeks from permit. A roll-in takes the waterproofing. We will not promise the wet room on the kitchen clock.
Book a design visit
Walk the house with us.
The first meeting is a free on-site consultation. Call 941-465-1372 or send a note to info@idesignbuildflorida.com.
More work in ReunionServices
Renovations and additions first
- Whole-House Renovation
- Aging-in-Place Remodeling & Smart Home Safety
- Kitchens & Baths
- Additions
- Custom Homes
- Exteriors & Outdoor Kitchens
- Roll-In Showers & Accessible Baths
- Furnishings & Decorating
- Design-Build
City work
- Kitchen remodel in Winter Park
- Luxury remodel in Orlando
- Whole-house renovation in Windermere
- Design-build in Reunion and Kissimmee
- Second-floor addition in Reunion and Kissimmee
- Whole-house renovation in Winter Park
- Kitchen remodel in Orlando
- Whole-house renovation in Lake Mary
- Kitchen remodel in Lakeland
- Whole-house renovation in Lakeland
- Kitchen remodel in Windermere
- Kitchen remodel in Lake Mary
- Roll-in shower in Windermere
- Roll-in shower in Orlando
- Roll-in shower in Reunion
- Outdoor living in Kissimmee
- Aging-in-place remodeling and smart-home safety in Central Florida
- Smart-home safety integrated into your renovation
- Bathroom remodel in Winter Park
- Outdoor kitchen in Windermere
- Outdoor kitchen in Lake Mary
Where we work
