Windermere · Orange County · License CGC1531832
Outdoor kitchen in Windermere
The cooking line sits under the same tile roof as the arched lanai, so the lake house reads as one elevation from the kitchen to the water.

The existing house
A lake house gets a new indoor kitchen. The grill shows up later, on a slab that was never under the roof. From the water, the back of the house is two jobs.
This is the Windermere whole-house renovation, not the Lake Butler bath. The indoor kitchen, the lanai, and this outdoor kitchen were one drawing.
How this job is built
We walked from the indoor kitchen to the lake before the drawing. The outdoor kitchen went under the existing tile roof with the lanai, not on an open slab beside it. The wet room in this house is a different room on that same plan. Lake Butler is a different Windermere bath.
Orange County. License CGC1531832. The outdoor kitchen is on the renovation permit with the house.
- Outdoor kitchen
- Under the tile roof, not a grill on an open slab.
- Lanai
- The arched opening to the lake, on the same elevation.
- Indoor kitchen
- Drawn with the outdoor cooking line so the two counters agree.
If this was your project
A Google review that names the city and the job is what shows up when a neighbor searches. In your own words: “Outdoor kitchen in Windermere.”
Leave a Google reviewPhotographs from this job




How we work
Design-build, from the visit to the walkthrough.
- 01
Discover
We start by understanding your property, goals, lifestyle, scope, and vision. The first meeting is a free on-site consultation.
- 02
Design
We develop the concept and design around your needs, property, and investment.
- 03
Plan
We coordinate the details, selections, permitting, scheduling, and construction planning.
- 04
Build
Our team manages construction through completion with attention to craftsmanship, communication, and quality.
- 05
Complete
Your project is finished with the same attention to detail that went into the planning and construction.
Same city, different scope
FAQ
Permits, time, and the first visit.
- Is this the Lake Butler house?
- No. Lake Butler is the curbless wet room. This outdoor kitchen is the other Windermere job, under the lanai roof.
- Was the outdoor kitchen added after the interior?
- No. It was on the same drawing as the indoor kitchen and the lanai.
- Who pulls the permit?
- iDesignBuildFlorida, Florida license CGC1531832. The first visit is free and on site.
Book a design visit
Walk the house with us.
The first meeting is a free on-site consultation. Call 941-465-1372 or send a note to info@idesignbuildflorida.com.
More work in WindermereServices
Renovations and additions first
- Whole-House Renovation
- Aging-in-Place Remodeling & Smart Home Safety
- Kitchens & Baths
- Additions
- Custom Homes
- Exteriors & Outdoor Kitchens
- Roll-In Showers & Accessible Baths
- Furnishings & Decorating
- Design-Build
City work
- Kitchen remodel in Winter Park
- Luxury remodel in Orlando
- Whole-house renovation in Windermere
- Design-build in Reunion and Kissimmee
- Second-floor addition in Reunion and Kissimmee
- Whole-house renovation in Winter Park
- Kitchen remodel in Orlando
- Whole-house renovation in Lake Mary
- Kitchen remodel in Lakeland
- Whole-house renovation in Lakeland
- Kitchen remodel in Windermere
- Kitchen remodel in Lake Mary
- Roll-in shower in Windermere
- Roll-in shower in Orlando
- Roll-in shower in Reunion
- Outdoor living in Kissimmee
- Aging-in-place remodeling and smart-home safety in Central Florida
- Smart-home safety integrated into your renovation
- Bathroom remodel in Winter Park
- Outdoor kitchen in Windermere
- Outdoor kitchen in Lake Mary
Where we work
